Structure & Build
Concrete Slab Calculator
Concrete for a slab — cubic yards for ready-mix, or 80 lb bags for a DIY pour.
Volume = length × width × thickness. Bags = cubic feet ÷ 0.6 per 80 lb bag.
About the Concrete Slab Calculator
Use this free concrete slab calculator to work out concrete for a slab — cubic yards for ready-mix, or 80 lb bags for a DIY pour. Enter your measurements below and you get an instant answer — no sign-up, no download. People search for this as “concrete slab calculator”, “how much concrete for a slab” and “how many yards of concrete for a slab” — this page answers all of them: how much you need, how many bags, boxes or gallons to buy, and what it covers, with 10% extra for waste already included.
People also search for
The exact phrases people type into Google for this job — this page is built to answer them.
Common questions
Straight answers, in plain words.
How much concrete slab do I need?
Enter your measurements in the Concrete Slab Calculator above — it uses this formula: Volume = length × width × thickness. Bags = cubic feet ÷ 0.6 per 80 lb bag. The result is rounded up, so you buy whole bags, boxes or gallons and do not run short mid-job.
How do I calculate concrete slab?
Volume = length × width × thickness. Bags = cubic feet ÷ 0.6 per 80 lb bag. Measure in feet (depth in inches, as the calculator asks), then divide by how much one bag, gallon, box or roll covers. Add 10% extra for cuts and waste — the calculator includes a waste allowance you can change.
How accurate is this concrete slab calculator?
It is an estimate for planning, using standard US product yields — for example one gallon of paint covers about 350 sq ft per coat and an 80 lb bag of concrete makes about 0.6 cu ft. Always check the label on the product you buy and your local building code before ordering.
Related calculators
More calculators for the same kind of job — each one on its own page.
Concrete Footing
Concrete for strip footings by total length, width and depth.
Concrete Steps
Concrete volume for solid poured steps by step count, width, rise and tread.
Sonotube / Concrete Column
Concrete for round sonotube footings and columns by diameter, height and count.
Rebar
Rebar for a slab grid — total linear feet and 20 ft sticks by spacing.
Mortar
Mortar bags for bricklaying by brick count — and the block rate too.